Shanghai ShiCi International Trading Co., LTD.
  • Products
    Products
    The company mainly produces and sells "HUAMAO" as well as "SANWEI" two major brand products. Products covered three series: One is polyvinyl alcohol (PVA) series of products with an annual capacity of 100,000 tons; the second is dispersible polymer powder can be 85,000 tons per year; the last is the cellulose products annual capacity of 60,000tons. 
  • Services
    Services
    Shanghai Shici is willing to provide products with high performance and high quality. Good after-sales services guaranteed for better shopping experience. Please feel free to contact us!
  • Company
    Company
    Shanghai shici International Trading Co.Ltd is a professional company which contain enterprise sales, warehousing, distribution, technical services. Shanghai Shici in view of the new market situation and customer demand, the establishment of raw material supply as the core, formulation research, technical support, such as supporting the "integration, one-stop" service marketing model. 
  • Application
    Application
    Our polyvinyl alcohol (PVA) series of products, dispersible polymer powder, hydroxy propyl methyl cellulose and other related products are well applied in many fields such as paper, adhesives and emulsion, textiles, barrier films, tec,.
  • Resources
  • Contact

Attentions of Putty Powder in Summer Construction

Into the June, the weather gradually hot, the sun also began to vicious up, walking on the road to the suburbs, roadside large golden fields of wheat, bursts of dry wind blowing over, wheat undulating rustling. Full of the ears of the spike son, as if bent waist respectful humility waiting to reap that moment, at this point in the distance has been faintly heard the roar of the Harvester, peasant friends on the scorching sun hard laborer. At this time, we as building materials industry to withstand the hot sun successfully through the summer putty powder construction. Hot and humid weather in summer.

Improper construction will bring about the influence of putty powder, how is the correct way of construction in summer?
First: Putty construction environment is the temperature in 5-35 ℃, air humidity is less than 85%, humidity is less than 10%.
Summer exposure, the temperature is too high, not only the substrate is easy to dry, water absorption fast, the strong solar light will also accelerate the putty powder evaporation speed. So that the surface of the putty after the construction of drying too fast, the emergence of skin, powder and the phenomenon of cracking after the batch.

High-temperature drying environment, you can use the Wall interface agent to close the substrate, or in the putty before the construction, two hours in advance with water moist wall, putty layer completely dry and then sprinkle water conservation.

1. according to the proposal to add water stirring, static 10 minutes after the ripening of stirring again;
2. has been allocated good putty powder in two hours of the proposal to run out;
3. avoid high-temperature environment and strong direct sunlight under the construction.

Secondly: the water content of the grassroots is 10%; no powder, no sand, no empty drums, no stripping, no lime burst point and no adhesion of the old coating, etc. surface no dust, no flotation, no oil, no rust, no mold point, no salts precipitate and moss and other miscellaneous.
Related News
  • TEL:+86 021-34781766
  • EMAIL:Trade@huamaomall.com
  • ADDRESS:ROOM208, Building39, No.2049, Pujing Road, Minhang District, Shanghai, China